LIVE CONCRETE & MASONRY TEMPLATE PREVIEWA4 · USD · 7.75% Default Tax
Bedrock Concrete & Masonry LLC
1840 Quarry Rd Salt Lake City, UT 84104
office@bedrockconcrete.co
Tax ID: UT-LIC #9928410
INVOICE
# INV-CON-2026-014
Issued: 2026-11-25
Due: 2026-12-25
Pour Spec / Site: 4,000 PSI — 1,100 sq ft
Bill To
Wasatch Custom Homes
2400 Foothill Dr Salt Lake City, UT 84109
ap@wasatchcustom.com
DescriptionQtyRateAmount
Site Excavation, Grading & 4-in Compacted Gravel Base1100$2.25$2,475.00
4,000 PSI Ready-Mix Concrete Supply (15 Cubic Yards)15$185.00$2,775.00
#4 Rebar Grid, Formwork, Pour, Trowel & Saw Cuts1100$5.50$6,050.00
Concrete Line Pump Truck Rental (Half Day)1$680.00$680.00
Subtotal$11,980.00
Tax (7.75%)$928.45
Total Due$12,908.45
Payment Terms

40% deposit prior to excavation; balance due Net 10 after saw-cut control joints.

Notes

4-inch thick 4,000 PSI air-entrained fiber-mesh slab over 4-inch compacted road base. Broom finish.

Construction & Trades

Free Concrete & Masonry Invoice Template (PDF & Online)

Cubic yards of ready-mix, rebar/forms, pump truck, and broom/stamped finish. Pre-populated with authentic concrete & masonry fields—including Pour Spec / Site and realistic itemized rows.

Customize Online
Included in this template
  • Custom trade header field: Pour Spec / Site
  • 4 realistic pre-filled concrete & masonry billing lines
  • Automatic subtotal, discount, and tax (7.75%) math
  • Watermark-free vector A4 PDF ready to email or print

Invoicing Field Guide

How to write and send a compliant concrete & masonry invoice

What belongs on a professional concrete & masonry invoice

Concrete and masonry invoices should record mix strength (PSI), cubic yards poured, slab thickness, rebar reinforcement grid, pump truck fees, and finish type (broom, exposed aggregate, stamped). In this pre-built concrete & masonry invoice layout, we include practical real-world defaults—such as "Pour Spec / Site" (4,000 PSI — 1,100 sq ft) and itemized billing rows like Site Excavation, Grading & 4-in Compacted Gravel Base; 4,000 PSI Ready-Mix Concrete Supply (15 Cubic Yards); #4 Rebar Grid, Formwork, Pour, Trowel & Saw Cuts—so you spend seconds adjusting quantities instead of rebuilding spreadsheet borders from scratch.

Recommended billing cycle & cash-flow habits for concrete & masonry

Because ready-mix batch plants demand prompt payment from contractors, collect a 40%–50% deposit before scheduling pour trucks. Standard terms for this template default to: "40% deposit prior to excavation; balance due Net 10 after saw-cut control joints." Using sequential invoice numbers (for example, INV-CON-2026-014) makes reconciling bank deposits and accounts receivable straightforward at month-end.

Sales tax, compliance & bookkeeping best practices

Specify ready-mix concrete material cubic yards cleanly alongside forming/finishing labor for state contractor tax compliance. When you receive supplier bills or job receipts alongside client invoices, pair this template with our Invoice to Excel and Receipt to Excel extractors to keep job-costing spreadsheets and year-end tax schedules audit-ready.

How to prevent payment delays and client disputes

Include brief curing instructions (keep vehicles off slab for 7 days) and hairline shrinkage crack disclaimers in the Notes. Before sending your final PDF, double-check that the bill-to legal entity name, due date, tax rate (7.75%), and payment instructions match your signed estimate or engagement agreement.

FAQ

Concrete & Masonry Invoice FAQ

Homeowners understand square-foot pricing best, while listing ready-mix supply in cubic yards transparently accounts for thickened edges and footings.